Latest Posts

Turbine fails community engagement test

An inspector has taken a firm line and declined to determine an appeal relating to a single wind turbine in Cornwall (DCS Number: 400-008-067). The appellants claimed that they had met the requirements for pre-application consultation set out in The Town and Country Planning (Development Management Procedure) (England) Order 2015, since the turbine would be of the same height as one proposed in an earlier scheme. The inspector would have none of it, however, invalidating the appeal and ruling that fresh consultation must be carried out.

DCP sections 26.5 and 6.3 refer.