Here is a case which raises a novel development management practice point

The owner of a semi-detached locally listed cottage in east London who built a three-storey rear extension in non-matching materials failed to convince an inspector that the development would comply with a condition requiring matching materials once he had cleaned up the bricks on the original house (DCS Number 400-009-655). Aside from the fact that the design of the extension did not comply with that granted planning permission, it had been constructed in new yellow stock bricks. The old bricks on the main building were yellow stock bricks but were now well weathered and significantly darker than when they were originally laid, probably well over 100 years ago. The inspector reasoned that if the appellant did manage to clean the old bricks successfully then the materials might match. However, no sample panel of cleaned bricks had been prepared and he simply did not know for sure if it would be an acceptable way forward. He could not, therefore, grant planning permission on this basis, he decided.

In this case the inspector was clear that there had been a breach of planning control, rejecting the argument that the work simply wasn’t finished yet.

The following DCP chapters are relevant: 4.3421 12.2

Leave a Reply

You must be logged in to post a comment.